in planning a road the first thing to do is to repair the ground for the shoulder of the road so that the CBR is needed, the way is to dig the shoulder of the road.
then make a pile on the excavation
after that did a stretch of base B
after that did a stretch of base A
after the stage has been passed then the next is paving